Floor Covering Installer
  Home
  Subscribe to FCI L!VE
  Subscribe
  FCI L!VE
  Subscribe to eNewsletter
  Subscription Customer Service
  Online
  Breaking News
  Web Exclusive
  Calendar
  Showrooms
  Bulletin Board
  Career Center
  Green Matters
  Current Issue
  Cover Story
  Feature Articles
  Columns
  Industry News
  Products
  Resources
  Archives
  FCI L!VE Archive
  Buyers Guide
  Digital Radiant Flooring Guide
  Classified Ads
  AEC Store
  Product Info (Free)
  Industry Links
  Market Research
  Installation Training Clinics & Schools
  FCI Info
Search in: EditorialProductsCompanies
FCICA: Installing Resilient Flooring over Cutback Adhesive
by Christopher Capobianco
October 1, 2006

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



Cutback is the black asphalt-based adhesive that was frequently used to install vinyl asbestos tile, asphalt tile and vinyl composition tile. In the replacement market today, most adhesives including carpet and resilient flooring adhesives are not compatible with cutback because it is an oil based product. As such, it is necessary to remove or encapsulate cutback residue before installing floor coverings since the residue of cutback can bleed through standard patching or leveling compounds and react with the adhesive and/or discolor some resilient flooring materials.

If the installation is over a wood subfloor, the easiest way to deal with cutback is to cover the entire floor including the floor covering with plywood underlayment and install the new floor covering on top of the new plywood. However, if the goal is to completely remove the asbestos containing materials from the building, then the flooring and the wood substrate beneath it must be removed and new plywood underlayment installed.

For concrete substrates, is advisable to remove cutback residue mechanically rather than with a chemical adhesive remover. Use the wet-scraping method as outlined in the RFCI “Recommended Work Practices for the Removal of Resilient Floor Coverings”. Do not sand, grind or blast this residue as the airborne dust may contain asbestos, a known health hazard. Wet scrape the floor so that the cutback residue is nothing more than a thin transparent layer, much like a stain on the concrete. Allow adequate time for the concrete surface to dry and then apply an approved underlayment or patching compound. Be sure the product is approved for use over cutback residue. Many products will adhere to cutback residue but not all such products will prevent bleed through.

In the case of trowel applied patching compounds, two coats are usually necessary in order to assure the complete coating of the floor. While chemical adhesive removers may be used, most floor covering manufacturers and the Resilient Floor Covering Institute (RFCI) have specific warnings against the use of solvents and adhesive removers since any residue of the adhesive remover left on the floor or in the cracks of the concrete may also dissolve the new adhesive or discolor floor coverings. If a chemical remover has been used, it is advisable to mechanically clean the surface of the concrete and then apply a self-leveling underlayment.


Christopher Capobianco

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

BNP Media