Floor Covering Installer
  Home
  Subscribe to FCI L!VE
  Subscribe
  FCI L!VE
  Subscribe to eNewsletter
  Subscription Customer Service
  Online
  Breaking News
  Web Exclusive
  Calendar
  Showrooms
  Bulletin Board
  Career Center
  Green Matters
  Webinars
  Current Issue
  Cover Story
  Feature Articles
  Columns
  Industry News
  Products
  Resources
  Archives
  Buyers Guide
  Digital Radiant Flooring Guide
  Classified & Dist. Marketplace Ads
  AEC Store
  Product Info (Free)
  Industry Links
  Market Research
  Installation Training Clinics & Schools
  FCI Info
Search in: EditorialProductsCompanies
Moisture-Sensitive Floor Coverings on Concrete Slabs


December 8, 2003

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



What follows is Position Statement #10 issued on August 27, 2003 by the American Society for Concrete Contractors (ASCC). It represents input from many people, including representatives of the floor covering industry.

This very significant document clearly lays out the moisture related problems. Equally important, it offers solid recommendations to significantly reduce the problems. It’s exciting to see how far we have come in because those in concrete, floor coverings and architects/specifiers are openly communicating with each other.

Position Statement #10: Many design professionals, construction managers, contractors, flooring and adhesive manufacturers, and concrete producers currently face problems related to moisture-sensitive floor coverings installed on concrete floors. The problems range from claims for construction-schedule delays caused by concrete drying slowly to lawsuits related to floor-covering failures and loss of facility use during removal and replacement of the floor covering.

Design and specifications for concrete slabs must address the moisture-emission potential of the concrete slab, protection of the slab from external water, and the compatibility of the concrete’s moisture and pH with the specified floor covering and adhesive. Guidance on the design and specification can be found in “Design of Slabs That Receive Moisture-Sensitive Floor Coverings: Part 1: A Design Guide for Architects and Engineers and Part 2: Guide to Specification Issues for Architects and Engineers”, Concrete International, March and April 2003.

Drying time will be extended when the ambient relative humidity is high, slabs are rewetted, or the building ventilation system isn’t yet operating. On projects with tight schedules, the engineer or architect should estimate the drying time needed to permit floor covering installation because compressing the schedule by using desiccant drying, surface treatments, or adhesives with a greater moisture tolerance generally increases project cost.

For projects where moisture-sensitive floor coverings will be installed, pre-bid meetings are desirable, but often aren’t practical. However, ASCC concrete contractors strongly recommend a pre-pour concrete meeting that includes:

• Owner, engineer, and architect

• Construction manager and/or general contractor and testing lab

• Concrete contractor and concrete producer

• Floor covering installer and representatives of the floorcovering and adhesive manufacturers

We also strongly recommend that an independent testing laboratory perform any specified moisture testing and provide copies of any reports to all the participants at the pre-pour meeting.

Specification requirements have a major effect on floor-covering performance. ASSC contractors will build the floor in accordance with specification requirements and suggest means for improving flooring performance whenever possible throughout the bidding and construction phases.

If you have any questions, contact your ASCC concrete contractor or the ASCC Technical Hotline at (800) 331-0668.



|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.













BNP Media