This photo shows why it is crucial to visit the job site
before quoting floor preparation. Photo courtesy of Dave Stafford.
Commercial resilient presents several challenges to the residential dealer and their installers and one of those challenges is in the area of substrate preparation. Because the jobs are larger, the time schedule is often rushed. With a lot more money on the line, there is more pressure on the installer. Proper training and proper planning can go a long way towards preventing mistakes. Here are a few do’s and don’ts.

Failure
to sufficiently nail the plywood underlayment on this job caused the floor to
buckle, leading to a complete replacement of the vinyl and the plywood.
Do make sure concrete slabs are tested; don't assume an older slab is dry
Every floor covering and adhesive manufacturer mandates moisture testing. If you have a moisture related failure, there isn’t a manufacturer anywhere who will cover it under their warranty. The industry standard, ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring states, “All concrete slabs shall be tested for moisture regardless of age or grade level.” Note the use of the word “shall” which means it is mandatory. Old or new, basement to penthouse - they all have to be tested. The two most common methods are ASTM F 1869 (Calcium Chloride Test) and ASTM F 2170 (Relative Humidity Probe test).You’ll notice I did not say YOU have to test it. In fact, the Floor Covering Industry White Paper Position Statement on Moisture Emission Testing, which was published in 2001, states “It is therefore our recommendation that concrete moisture vapor emission testing be performed by qualified independent agencies.” The advantage of independent testing is that you know it is done right and the general contractor and the flooring contractor “each has a vested interest on the testing and/or performance outcome of the installation.” In other words, they would like to see the concrete pass the test so the job can move forward and get paid. So, if it can be done independently that’s a good thing because it takes all that uncertainty out of the conversation.

Self-leveling underlayment is a fast way to achieve a
smooth, flat floor. Although it may cost more than trowel-applied patching
compounds, the smoother finish and time savings are often worth the money.

By
taking advantage of training opportunities, installers can upgrade their skills
to be able to handle more detailed tasks such as moisture testing and
self-leveling underlayment.
Don't install resilient flooring in buildings that are not climate controlled
The reason flooring and adhesive manufacturers have temperature guidelines in their recommendations (approximately 70F, +/-10F). The number of failures caused by installing in a building that is too hot or too cold is substantial because material can expand and contract from extremes of temperature and adhesive may not cure properly. If you are being asked to work in conditions that do not agree with the manufacturer’s guidelines the word warranty may not be in the conversation.
Failure to install resilient flooring in a climate
controlled space can lead to gapping in the finished floor when the product
expands or contracts due to temperature changes.
Do take your time smoothing the substrate; don't assume "a little patching" suffice
Commercial resilient floors are often installed in brightly lit areas and are maintained to a high-gloss finish. Because of this, even the most minor substrate irregularities telegraph through to the new floor. My father used to joke, “Don’t leave your business card on the floor,” when he talked about smooth high-gloss flooring materials. New slabs or plywood subfloors usually need some level of work before a floor goes down. On renovation work, the preparation can be extensive. Be sure to go out and look at the job before you quote on floor preparation so that you don’t underbid the job and get in trouble later.If the floor is rough, it may need more than just patching compound to get it smooth. Self-leveling underlayments are growing in popularity because although there is added cost, a self-leveling job results in a smoother substrate than any amount of patching or sanding and it saves a lot of time. “Time is money” often applies to big commercial jobs. If you don’t know how to use self-leveling products, many manufacturers of these products offer training classes, often at very little cost to the attendees, other than travel expenses and your time. I know I said time is money, but taking the time to learn a skill you can make money on is a good investment.

The Relative Humidity Test (ASTM F 2170) has been used in Europe
for more than 25 years, and introduced into the U.S.
in the last five years. Many feel this is the most accurate method for testing
concrete for moisture. Photo courtesy of Tramex.
Do pay attention to details when preparing wood subfloors; don't skimp on underlayment
I recently inspected a job in a retail-clothing store where the plywood buckled after the vinyl tile was installed, and found the reason to be not enough nailing. Proper spacing is called out by plywood manufacturers, and there are two industry standards that specify the same thing: ASTM F 1482, Guide for Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring and APA Engineered Wood Construction Guide, Form E30, published by the Engineered Wood Association (APA). Both call for fastener spacing every 3” on the edges and every 6” in the field. This job had spacing ranging from 5- to 17-inches, and the floor buckled all over the place. All of the vinyl had to be ripped up, the plywood re-nailed and new plywood installed over the top. It was quite a mess and an expensive mistake for the installer.If you are asked to install underlayment on a commercial job, make sure the product fits the job. Don’t ever use Lauan or other inconsistent quality products because they can dent, delaminate, telegraph or even stain the floor. Use a top quality, hard smooth panel so the floor will perform under heavy traffic. Although the better products cost more, they come with a warranty and you can bet that the owner would rather pay a little more for a floor that has a warranty.
Follow the nailing pattern, stay away from screws to fasten the underlayment down (staples work best), and patch the joints as directed by the underlayment manufacturer. See my column “Tips for Selecting and Installing Plywood Underlayment” (FCI, July/August 2007) or any number of other articles in theFCIarchives for more information about underlayment selection and installation.

The
Calcium Chloride Test (ASTM F 1869) is an accepted method for concrete moisture
testing that has been in use for more than 50 years.

Methods like the plastic sheet test are not acceptable for
deciding if a concrete slab is ready.
- Floor Covering Installer magazine: www.fcimag.com
- ASTM Standards: www.ASTM.org
- Institute of Inspection, Cleaning and Restoration Certification (IICRC): www.iicrc.org
- Floor Covering Industry White Paper on Moisture Emission Testing: www.wfca-pro.org
- The Engineered Wood Association (APA): www.apawood.org
- Articles by Christopher Capobianco: www.flooringanswers.com