
USG has announced that its Levelrock CSD Early Exposure floor underlayment can be poured up to 60 days before the building’s permanent windows and doors are installed. Designed for use in buildings with light-gauge steel frame construction, this underlayment can be applied over corrugated steel decks, allowing for economical construction of midrise buildings, the company says.
Report Abusive Comment